How to price a job: a UK guide for tradesmen

Pricing a job comes down to one sum: the days it takes at your day rate, plus materials, plus the costs of running your business, plus VAT if you’re registered. Most pricing mistakes come from leaving something out of that sum, not from the arithmetic.

The short version

Price = (days × day rate) + materials + markup + travel and waste + your share of overheads + VAT if you’re registered

Then add an allowance for anything you can’t see yet, or write it down as an exclusion.

Check a price with the free estimator →

1. Your day rate

Your day rate has to cover your wages and the days you can’t charge for: quoting, buying materials, bad weather, holidays, illness and paperwork.

One way to set it:

  • •Decide what you want to earn in a year.
  • •Count the days you’ll actually bill. Start with the working days in a year, then take off holidays, bank holidays, and days lost to quoting, admin and weather.
  • •Divide the first number by the second.

Example (your numbers will differ): you want £52,000 a year and expect to bill 200 days. £52,000 ÷ 200 = £260 a day before overheads.

Then check it against local rates. For reference, these are the 2026 labour-only day rates PriceMyJob’s estimator works with:

Day rates by trade (2026, labour only)

TradeDay rate
Plumber£250 – £380
Electrician£250 – £400
Gas engineer£280 – £420
Carpenter / joiner£220 – £350
Roofer£250 – £380
Painter and decorator£200 – £300
Plasterer£220 – £320
Tiler£220 – £350
Bathroom or kitchen fitter£250 – £380
General builder£300 – £400
Labourer£160 – £240

London and the South East usually sit at the top of these ranges. The Midlands, the North, Wales and Scotland sit lower.

2. How many days the job really takes

Price the days a typical job takes, not your best day ever. Count:

  • •setting up and protecting the customer’s home
  • •preparation, which is often longer than the job itself
  • •drying and curing time (a coat that has to dry first means another visit)
  • •snagging, cleaning up and the final walk-round with the customer
  • •getting there and back, if it eats into the day

If you’re not sure, round up to the next half day.

3. Materials and markup

  • •Price materials from today’s supplier prices, not last year’s.
  • •Add an allowance for cuts, offcuts and breakages. Your supplier can tell you how much for the material and layout.
  • •Include the small things: adhesive, grout, fixings, sealant, primer, trims, dust sheets, tape. They add up.

Markup: many trades add a percentage on materials they buy. It pays for collecting them, storing them, sorting returns and putting things right if a part fails. How much is your call. Just be consistent, and know whether your price includes it. If the customer is buying the materials, say so in writing, and say who’s responsible if they arrive wrong or late.

4. Overheads

Overheads are what it costs to be in business, whether you’re working or not: the van and its fuel, insurance, tools and their repair, your phone, software, accountant, advertising and website.

Example: if your overheads come to £9,000 a year and you bill 200 days, that’s £45 a day. Add it to each day on the job, or build it into your day rate. Just don’t count it twice.

5. Travel, parking and waste

  • •Travel: add it if the job is out of your usual area.
  • •Parking and charges: permits, pay-and-display, congestion or clean-air zone charges. Ask the customer about parking before you price.
  • •Waste: old tiles, plasterboard, packaging and rubble cost money to get rid of: tip fees, a skip or a waste firm. If you carry waste away yourself, you need to register as a waste carrier (GOV.UK: register as a waste carrier). In England it’s usually free if you only carry waste you produce yourself.

6. VAT

  • •If you’re VAT-registered, add VAT to your price, at 20% for most building work. Some work is charged at a lower rate or none; check HMRC’s guidance for the job.
  • •You must register for VAT if your taxable turnover over the last 12 months goes over £90,000, or if you expect it to go over £90,000 in the next 30 days alone (GOV.UK: when to register for VAT).
  • •Always say clearly whether a price includes VAT. “£2,000” and “£2,000 plus VAT” are £400 apart.

7. Unknowns: contingency and exclusions

Some things you can’t see until you start: what’s behind the old tiles, rotten boards, old wiring, a wall that isn’t straight. You have two honest choices:

  • •Price the risk in: add a set amount for the most likely problem and explain it.
  • •Exclude it and price the extra: write “if the walls need replastering after the old tiles come off, that’s £X a day extra” in the quote.

Either is fine. What causes arguments is a surprise bill with nothing in writing.

8. Quote or estimate?

  • •A quote is a fixed price for the work described.
  • •An estimate is your best guess, and the final bill can change.

Say which one you’re giving, put it in writing, and describe exactly what’s included and what isn’t.

9. Worked example: a bathroom retile

The job: strip the old tiles and retile the walls round the bath and shower (12 m²) and the floor (4 m²). The customer chooses mid-range tiles, and you buy everything.

All figures below are examples. Use your own prices.

ItemWorkingAmount
LabourStrip and prepare 1 day, walls 2 days, floor ½ day, grout, silicone and clean ½ day = 4 days × £260£1,040
Tiles16 m² plus extra for cuts, say 18 m² × £25£450
Adhesive, grout, primer, trims, silicone£120
Markup on materials10% of £570 (your choice)£57
WasteOld tiles and rubble to the tip£60
Travel and parking£20 a day × 4£80
Overheads£45 a day × 4£180
Price£1,987 → £1,990
VAT (if registered)20%£398
Price with VAT£2,388

In the quote, write down what’s included (the areas, who supplies the tiles), what isn’t (replastering, a new floor if the old one is rotten), and your rate for extras.

10. Common mistakes

  • •Pricing too low. It’s the big one. It usually comes from leaving out the days you can’t bill, the drying time, the overheads or the waste, not from a wrong day rate.
  • •Giving a fixed price over the phone before you’ve seen the job.
  • •Forgetting to count quoting time. If you quote three jobs to win one, that time has to be paid for somewhere.
  • •Vague quotes (“retile bathroom”) that lead to arguments about what was included.
  • •Not saying whether VAT is included.
  • •Using old material prices.
  • •No payment terms. Say when you want paying, and whether you take a deposit for materials.

11. “Quote my job”: a quick price to check against

Sometimes you need a figure fast: to sense-check your own price, or to give a customer a ballpark before you visit. PriceMyJob gives you an itemised UK price in seconds. Describe the job, add photos if you like, and you get materials and labour separated, which you can adjust. It’s free and needs no signup.

Use it as a check, not as your quote. You know the job, the customer’s house and your own costs. It doesn’t.

Price a job now →

Want customers to find you on Google? Build your own trade website free, £49 a month if you like it →

Frequently asked questions

How do I work out my day rate?

Decide what you want to earn in a year, divide it by the days you’ll actually bill, then add your daily share of overheads. Check the result against local rates for your trade.

Should I charge a markup on materials?

Many trades do, to cover collecting, storing and handling returns. It’s your choice. Be consistent, and if the customer buys the materials, put that in writing.

Do I have to charge VAT?

Only if you’re VAT-registered. You must register once your taxable turnover over the last 12 months goes over £90,000, or if you expect it to go over £90,000 in the next 30 days alone. If you’re registered, say clearly whether your price includes VAT.

What’s the difference between a quote and an estimate?

A quote is a fixed price for the work described. An estimate is a best guess that can change. Tell the customer which one you’re giving, in writing.

Sources

  • Day rates: the 2026 labour-only rates used by the PriceMyJob estimator.
  • VAT registration: GOV.UK, When to register for VAT (read 12 November 2026).
  • Waste carriers: GOV.UK, Register as a waste carrier, broker or dealer (read 12 November 2026).